Frequently asked questions
Do I need the CAD files?
Most people will only need the PDF construction set for permitting and construction. CAD files are useful if you plan to have a local design professional modify the drawings or adapt the design to your site. Both options include the same construction drawings.
Can I modify this design?
Yes, kabn can modify layouts, dimensions, windows, doors, rooflines, foundations, and other details to suit your project. Contact us for an estimate.
Do these plans meet code?
Yes, kabn plans are designed to the most current IRC code. Building requirements do vary by location and additional engineering, energy-code documentation, or site-specific modifications may be required for permitting.
Can you help with permitting?
kabn provides drafting and plan support for clients managing their own local permitting throughout the US and Canada, with direct permitting services also available in Washington State.
How much will this cost to build?
Construction costs vary by region, materials, and finishes. kabn plans are designed for efficient, affordable construction and long-term energy savings. Why spend thousands on a generic stock plan? Start with an affordable kabn design that works as-is or can be tailored to your site, budget, and needs.